Demolition & Removal Company System
Demolition and building-removal contractors with special safety and permit requirements and heavy equipment.
The demolition job from survey to the safety report, with an approved phased plan and documented safety procedures that legally protect the company.
No credit card required — your project is set up with the full system in under a minute
This is the system board as you'll receive it: workflow columns and starter cards showing the first steps
How does work flow in this system?
Every demolition job is a card that starts in “Survey” by inspecting the building and documenting its structural condition, the neighboring buildings, and the utility lines, then moves to “Permit” to obtain municipality and Civil Defense approvals and have utilities officially disconnected. In “Plan”, the safety engineer sets the phased demolition sequence, the method of isolating the site, and neighbor protection, and approves it before any equipment moves; then “Execution” phase by phase per the plan, not the site's mood; then “Leveling” with debris removal, basement backfilling, and ground leveling; and finally the documented closing safety “Report” for the owner and the authorities.
The Forum documents the approved safety procedures: every near-miss or safety observation gets a topic — what happened, why, and what the preventive measure is — because a documented safety record is the company's legal protection before the authorities and its reputation before owners. Chat is for urgent site calls: an immediate stop at a hazard, directing equipment, or clearing an area before dropping a section — messages that brook no delay.
Dues records the cost of equipment, crews, containers, and debris disposal fees for each job, and tracks what is sold from salvage — rebar, timber, aluminum — as revenue offset against the cost, so each site's net profit is visible. The safety engineer holds full authority to stop “Execution” with a suspended card until the hazard clears, and the execution supervisor starts no new phase before the completion of the previous one is certified per the plan documented in the Forum.
Who does what?
The operational roles in this system and each role's responsibility in daily work — assign them to your team as-is or adapt them to your reality.
Safety Engineer
Sets and approves the phased demolition plan, holds the power to stop execution at any hazard, documents safety procedures and near-misses in the Forum, and issues the closing report.
Execution Supervisors
Lead equipment and crews phase by phase per the plan, upload daily progress photos to the card, and confirm site isolation and neighbor protection before every shift.
Permits & Utilities Coordinator
Follows authority approvals in “Permit” and confirms the official disconnection of power and water, and documents neighbors' observations and complaints and resolves them before escalation.
What's prepared for you from day one?
System units
- Tasks — A kanban board with workflow columns and execution cards
- Chat — The team's fast daily coordination channel
- Forum — Documented discussions in organized sections — decisions and knowledge that never get lost
- Dues — Internal money with strict privacy — dues, advances, and expenses
Forum sections (3)
- Documented Safety ProceduresThe approved demolition safety rules, near-misses, and their lessons — the company's legal record.
- Reference Demolition PlansSuccessful past job plans to consult for buildings similar in construction or height.
- Authorities & PermitsMunicipality and Civil Defense requirements and their updates, and experience dealing with them in each region.
«Working Rules for This System» — Pinned in the forum
1) No demolition without a permit: no equipment moves before “Permit” is complete and utilities are officially disconnected. 2) Execution follows the approved plan phase by phase — any modification is approved on the card before it is executed. 3) A stop order from the safety engineer is binding on everyone and is only lifted by their documented decision. 4) Every near-miss is documented in the “Documented Safety Procedures” section the day it occurs — Chat is for urgent calls only. 5) Salvage sales are recorded in Dues and offset against the job's cost as they occur.