Complete Product Department System
A product team shipping the company’s products in continuous releases and needing one path from idea to measurement.
The full product cycle: from idea to priority to build to release, then impact measurement that feeds the next improvement.
No credit card required — your project is set up with the full system in under a minute
This is the system board as you'll receive it: workflow columns and starter cards showing the first steps
How does work flow in this system?
Every feature or improvement idea enters “Ideas” from any team member or from user feedback. In the periodic prioritization meeting, the product manager moves ideas to “Priority” after weighing impact against effort — ranked explicitly, not implicitly: everyone sees what comes before what, and why. Whatever reaches the top moves to “Build”, owned by the developer–designer pair until it meets the acceptance criteria written on the card. When a set of features is ready it rolls into “Release” and ships to users; then it enters “Measurement” to track adoption and usage metrics for a set period, and any gaps that surface become “Improvement” cards returning to the “Priority” cycle.
Chat is the team’s daily pulse: a technical question, design coordination, or a blocker escalation resolved in minutes. The Forum documents major product decisions — why we postponed a feature, why we chose this solution — so the same debate isn’t reopened every month. Announcements publish each release’s notes officially to the company: what’s new, who it’s for, and how to use it — so Sales and Support know what they’re talking about with customers. Dues manages tool subscriptions and team rewards in privacy, keeping internal money in one place, not side files.
The product manager oversees the whole board: ranking “Priority”, approving entry into “Build”, and deciding “Release” timing. Feature owners own their cards from idea to measurement, writing requirements and acceptance criteria. Developers and designers execute in “Build” and keep cards updated. Information flows in a circle: everyone reads “Measurement” results, and new ideas born from them re-enter the board through its front gate.
Who does what?
The operational roles in this system and each role's responsibility in daily work — assign them to your team as-is or adapt them to your reality.
Product Manager
Oversees the whole board, ranks “Priority”, approves entering Build and shipping releases, and settles conflicts with documented decisions in the Forum.
Feature Owners
Own their features from idea to measurement: writing requirements and acceptance criteria, and tracking adoption metrics after release.
Developers
Build features to the acceptance criteria, update “Build” cards daily, and escalate blockers immediately in Chat.
Designers
Turn requirements into buildable interfaces, review the implementation visually before release, and document design decisions in the Forum.
Release Coordinator
Prepares release notes and publishes them in Announcements, and verifies the launch checklist is complete before the date.
What's prepared for you from day one?
System units
- Tasks — A kanban board with workflow columns and execution cards
- Chat — The team's fast daily coordination channel
- Forum — Documented discussions in organized sections — decisions and knowledge that never get lost
- Announcements — The official voice of management — circulars and alerts that reach everyone
- Dues — Internal money with strict privacy — dues, advances, and expenses
Forum sections (4)
- Product DecisionsDocumenting major decisions and their reasons: what was decided, which alternatives were rejected, and who approved it — a reference that prevents reopening the debate.
- PrioritizationDebating impact and effort for candidate features before the ranking meeting, backed by numbers and user feedback.
- User FeedbackWhat arrives from users via Support and Sales, compiled into classified topics — fuel for the “Ideas” column.
- Working MethodDeveloping the team’s own way of working: definition of ready, acceptance criteria, and release cadence.
«Working Rules for This System» — Pinned in the forum
1) Every feature starts as a card in “Ideas” describing the user’s problem, not a ready-made solution. 2) Nothing enters “Build” except from “Priority”, with acceptance criteria written on the card. 3) Major product decisions are documented in the “Product Decisions” section — Chat is for daily coordination only. 4) Every release is announced with its notes in Announcements on ship day, no exceptions. 5) A release card is not closed before a defined “Measurement” period and documented results. 6) Tool subscriptions and rewards are recorded in Dues and never managed in side files.
Welcome announcement: «Our New Way of Building the Product»
From today, every feature has one path: born in “Ideas”, ranked in “Priority”, built, released, then measured — no work happens off the board. Major decisions are documented in the Forum, and release notes are published here officially. First step: log your current ideas now, and read the pinned “Working Rules” topic in the Forum.
Systems similar to this one
Ready? Your first project is two minutes away
Create your free workspace now, and invite your team before the day is over.

